Message boards : Number crunching : 3-day deadlines
Author | Message |
---|---|
googloo Send message Joined: 15 Sep 06 Posts: 133 Credit: 22,722,686 RAC: 3,784 |
What's up with all these tasks coming down with 3-day deadlines? |
David E K Volunteer moderator Project administrator Project developer Project scientist Send message Joined: 1 Jul 05 Posts: 1018 Credit: 4,334,829 RAC: 0 |
I'll look into this. It's likely due to modelling we are doing for a collaboration with SSGCID. https://www.ssgcid.org/ |
Mod.Sense Volunteer moderator Send message Joined: 22 Aug 06 Posts: 4018 Credit: 0 RAC: 0 |
A mixture of 8-day and 3-day deadlines is now the normal for the project. Generally the 3-day deadlines are seen Friday through the weekend. Rosetta Moderator: Mod.Sense |
googloo Send message Joined: 15 Sep 06 Posts: 133 Credit: 22,722,686 RAC: 3,784 |
A mixture of 8-day and 3-day deadlines is now the normal for the project. Generally the 3-day deadlines are seen Friday through the weekend. That's why I asked, because it was Wednesday. |
Defender Send message Joined: 22 Mar 08 Posts: 10 Credit: 13,517,861 RAC: 227 |
Can you tell us more about this collaboration? |
Message boards :
Number crunching :
3-day deadlines
©2024 University of Washington
https://www.bakerlab.org