Message boards : Number crunching : What, when time limit is reached ?
Author | Message |
---|---|
Mark100 Send message Joined: 29 May 06 Posts: 7 Credit: 6,245,379 RAC: 0 |
Hi, i have still 2 WU here, with a deadline of 10th of decembre, actually we have 11th dec, should i delete them or are they still accepted ? http://boincstats.com/en/stats/-1/user/detail/3737548/projectList |
Mod.Sense Volunteer moderator Send message Joined: 22 Aug 06 Posts: 4018 Credit: 0 RAC: 0 |
I would suggest that you abort them. Was there some unexpected reason that they did not complete or report on time? ...or did you just have your machine off or other reason that this was expected? Rosetta Moderator: Mod.Sense |
Mark100 Send message Joined: 29 May 06 Posts: 7 Credit: 6,245,379 RAC: 0 |
Nothing unnormal happened, i just got them pretty late, i have my pc evey day some hours running and it makes 7 WU simultaneously. Must have been a very close deadline already as i got them. http://boincstats.com/en/stats/-1/user/detail/3737548/projectList |
Mark100 Send message Joined: 29 May 06 Posts: 7 Credit: 6,245,379 RAC: 0 |
This happened actually. Today its the 13th of decembre, the last few WU i got have a deadline for 20st and 21st, but a few minutes ago then i got some with a deadline for 16th. Since i switched the length of WU back from 8 h to 4 h but i still get long WUs, i suspended some WUs to get the 16ers running. http://boincstats.com/en/stats/-1/user/detail/3737548/projectList |
Mod.Sense Volunteer moderator Send message Joined: 22 Aug 06 Posts: 4018 Credit: 0 RAC: 0 |
The deadlines do not reflect your runtime preference for the tasks. And the estimated runtimes do not immediately adjust to your new preference. Also, some types of R@h work have the 3 day deadlines, and the others have 8 day deadlines. ...and yes, that can sometimes confuse the BOINC Manager on when more work is needed, and which tasks it really needs to be running first. I have similar problems myself, and especially when WCG drops in tasks with 24hr deadlines. I figured your original issue was something like that, but did not want to presume there were not other issues that brought you there. Rosetta Moderator: Mod.Sense |
rjs5 Send message Joined: 22 Nov 10 Posts: 273 Credit: 23,054,272 RAC: 7,218 |
The deadlines do not reflect your runtime preference for the tasks. And the estimated runtimes do not immediately adjust to your new preference. Also, some types of R@h work have the 3 day deadlines, and the others have 8 day deadlines. Has anyone looked at how many times the person submitting work puts a short deadline and results are not returned by the deadline? I was thinking that they could possibly use the result returned .... say 1 hour late ... rather than reissuing the work again and getting it back in 3 days. Just curious. I still cannot figure out why Rosetta does not issue credit for work started before the deadline and completed. Those credits must be very expensive to purchase from BOINC. |
Mark100 Send message Joined: 29 May 06 Posts: 7 Credit: 6,245,379 RAC: 0 |
tbh i don't understand completely why there has to be such a close deadline, do WUs rot ? http://boincstats.com/en/stats/-1/user/detail/3737548/projectList |
Sid Celery Send message Joined: 11 Feb 08 Posts: 2125 Credit: 41,228,659 RAC: 9,701 |
tbh i don't understand completely why there has to be such a close deadline, do WUs rot ? This was explained about a year ago here |
Message boards :
Number crunching :
What, when time limit is reached ?
©2024 University of Washington
https://www.bakerlab.org